by Cedric Chone | Apr 22, 2016
; 140 Building Illinois Design Summary: Scope: the air conditioning system for the Sam Adams Pub required renovation. The system is replaced with a new more efficient system which incorporates integrated sustainable principles. Our solution is based upon providing a...
by Cedric Chone | Apr 22, 2016
110 Building ; 110 building North Chicago, Illinois Design Summary: Renovation of the Ross Theater – Building 110, Great Lakes Navy Base info@soosarchitects.com (847) 821-7667 Notice: JavaScript is required for this...
by Cedric Chone | Apr 22, 2016
523 Building ; 523 building Illinois Design Summary: Scope: Renovate north portion of building for relocation of space allocations. Exterior Work including masonry /coping repairs at four corners of building where metal siding terminates on stone coping. Oil/water...
by Cedric Chone | Apr 22, 2016
Crane Rail ; Crane Rail Design Summary: The structural work scope was to design bracing for the two existing crane rail systems, in the direction perpendicular to the crane travel. We addressed and resolved the load paths generated during a lift to the existing...
Recent Comments